CBM Resistance 1800 D.47 L.335 mm
CBM CE | Résistance 1800 D.47 L.335 mm
SKU 3G-CBM-00002
- 6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
- Invoicing in IDR or USD. Bank transfer and corporate PO accepted.
- Dikirim ke: Jakarta, Surabaya, Bandung, Medan, Batam
Local availability & support — Indonesia
- Phone
- +65 8878 8355
Butuh bantuan pemasangan atau rekayasa?
Ajukan pertanyaan
Deskripsi Produk
CBM CE | Résistance 1800 D.47 L.335 mm
Supplied to Indonesia — compatible with 50 Hz installations. DHL Express delivery to Jakarta, Surabaya, Bandung, customs and duties handled door-to-door.
Pertanyaan yang Sering Diajukan
What is the CBM Resistance 1800 D.47 L.335 mm used for?
The CBM Resistance 1800 D.47 L.335 mm is a water heater heating element designed for immersion in water tanks. It is commonly used in commercial and industrial water heating systems across Singapore to provide reliable electric heating, ensuring consistent hot water supply for facilities such as hotels, laundries, and food processing plants.
What are the specifications of the CBM Resistance 1800 D.47 L.335 mm?
The CBM Resistance 1800 D.47 L.335 mm is a water heater part with a diameter of 47 mm and a length of 335 mm. It operates at 1800 W and is designed for immersion heating. The element is made by CBM and carries CE certification, ensuring compliance with European safety and performance standards for industrial water heating applications.
Where to buy the CBM Resistance 1800 D.47 L.335 mm in Singapore?
You can source the CBM Resistance 1800 D.47 L.335 mm through 3G Electric, an industrial equipment distributor established in 1990. We handle logistics, customs clearance, and delivery to your facility in Singapore, providing technical support for selection and installation. Contact us for availability and lead time on this water heater part.
How to install the CBM Resistance 1800 D.47 L.335 mm?
To install the CBM Resistance 1800 D.47 L.335 mm, first disconnect power and drain the water heater tank. Remove the old element, clean the mounting surface, and apply thread sealant. Insert the new element, tighten securely, and reconnect wiring. Refill the tank and check for leaks before restoring power. Always follow local electrical codes and manufacturer guidelines.
Digunakan dalam
Aplikasi umum untuk CBMCBM Produk
3G Electric memasok CBM boiler spare parts. Kami menyediakan produk asli dengan ketersediaan tersedia di gudang untuk SKU umum, dokumentasi teknis, dukungan commissioning, dan layanan garansi — di seluruh dunia.
