COTTERMAN Crossover Bridge: 3.3 ft Platform Ht, Aluminum, 500 lb Load Capacity, Serrated
The COTTERMAN Crossover Bridge is a space-saving crossover bridge with a 3.3 ft platform height. It features a gray, serrated tread type and a 500 lb load capacity, with 5 steps. This aluminum unit is identified by…
SKU 3G-OTH-328936
- 6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
- Invoicing in IDR or USD. Bank transfer and corporate PO accepted.
- Dikirim ke: Jakarta, Surabaya, Bandung, Medan, Batam
Butuh bantuan pemasangan atau rekayasa?
Ajukan pertanyaan
Deskripsi Produk
The COTTERMAN Crossover Bridge is a space-saving crossover bridge with a 3.3 ft platform height. It features a gray, serrated tread type and a 500 lb load capacity, with 5 steps. This aluminum unit is identified by manufacturer part number 5SPA24A3C50P3.
Supplied to Indonesia — compatible with 50 Hz installations. DHL Express delivery to Jakarta, Surabaya, Bandung, customs and duties handled door-to-door.
Pertanyaan yang Sering Diajukan
What is the COTTERMAN Crossover Bridge used for?
The COTTERMAN Crossover Bridge provides safe, elevated access across machinery, conveyors, or pipes in industrial plants. Its 3.3 ft platform height and 500 lb load capacity support maintenance and material handling tasks, while the serrated tread reduces slip risk in oily or wet environments.
What are the specifications of the COTTERMAN Crossover Bridge 5SPA24A3C50P3?
This COTTERMAN crossover bridge has a 3.3 ft platform height, 5 steps, and a 500 lb load capacity. It is made of aluminum with a gray, serrated tread type. The manufacturer part number is 5SPA24A3C50P3. It is designed for space-saving installation in industrial settings.
Where to buy the COTTERMAN Crossover Bridge worldwide?
3G Electric supplies the COTTERMAN Crossover Bridge to customers worldwide. As a global industrial solutions provider, we handle full logistics, customs clearance, and delivery to your site. Contact us for pricing and lead time on this aluminum, 500 lb capacity crossover bridge.
How to install a COTTERMAN Crossover Bridge?
Installation typically involves anchoring the bridge to a stable, level surface per the manufacturer's instructions. Ensure the 3.3 ft platform height aligns with adjacent equipment. Use proper lifting equipment for the 500 lb rated aluminum unit. Always follow OSHA guidelines for elevated walkways and verify load capacity before use.
Digunakan dalam
Aplikasi umum untuk COTTERMANCOTTERMAN Produk
3G Electric memasok COTTERMAN space saving crossover bridges. Kami menyediakan produk asli dengan ketersediaan tersedia di gudang untuk SKU umum, dokumentasi teknis, dukungan commissioning, dan layanan garansi — di seluruh dunia.















