3G Electric
GAS P 1300/M CE TL EL
FBR

GAS P 1300/M CE TL EL

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS P 1300/M CE TL EL

Minimum order
1 unit
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages sliding or modulating
fuel typeGas
nozzle mm655
weight kg315
descriptionBurners for gas two stages progressive or modulating (PID fully modulating) if equipped with addition of optional modulation kit and probe.
fan motor w22
power kw max13372
power kw min1977
ip protectionIP54/IP40
noisiness dba88-92
gas consumption117/351-760
electrical supply3
power supply info3~400V, 1N~230V - 50Hz
current absorption a43
thermal power mcal h1000/3000-6500
nominal electric power w22.5
max combustion air temp c60

Frequently asked questions

Where can I buy FBR GAS P 1300/M CE gas burner in Indonesia?+

Order from 3G Electric Indonesia. We source and deliver to Jakarta and Surabaya with full logistics and Bea Cukai customs handling. Lead time on request via email or phone.

What is the lead time for FBR GAS P 1300/M delivery?+

Lead time varies by availability. 3G Electric handles all import documentation and logistics to your site in Indonesia. Contact us for a specific delivery timeline and IDR quotation.

What are the thermal output and modulation capabilities of GAS P 1300/M CE?+

Two-stage modulating design delivers 1000–6500 mcal/h thermal output with optional PID modulation kit. IP54/IP40 protection, 22 W fan motor, and 88–92 dBA noise level suit large industrial heating systems.

Enquire about GAS P 1300/M CE TL EL

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward