3G Electric
variant_1 | Subgroup: Gas trains
FBR

variant_1 | Subgroup: Gas trains

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS/2 CE-CT D2" S | Variant: variant_1 | Subgroup: Gas trains

Minimum order
6 units
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages sliding or modulating
fuel typeGas
nozzle mm250
weight kg44
descriptionGas burners two stages low emissions class 4 (NOx < 60 mg/kWh).
fan motor w1.5
power kw max1163
ip protectionIP 40
noisiness dba81-82
gas consumption20.1/58.3-116.17
electrical supply3
power supply info3~400V, 1/N~230V-50Hz
current absorption a3.6
thermal power mcal h172/500-1000
nominal electric power w1.7
max combustion air temp c60

Frequently asked questions

Where can I source the FBR GAS/2 burner in Indonesia?+

3G Electric Indonesia supplies the FBR GAS/2 two-stage gas burner with delivery to Jakarta and Surabaya. We handle all logistics, Bea Cukai import clearance, and IDR invoicing for B2B buyers across Indonesia's manufacturing corridors.

What is the lead time and delivery schedule?+

Lead time is available on request. 3G Electric arranges door-to-door delivery to Jakarta and Surabaya with full customs documentation. Contact us for your specific order timeline and logistics requirements.

What emission class does the FBR GAS/2 achieve?+

The FBR GAS/2 delivers low-emission class 4 performance with NOx < 60 mg/kW across its 172–1000 Mcal/h range. It operates at 3~400V, 50 Hz with a 1.5 kW fan motor, supporting both modulating and sliding combustion control.

Enquire about variant_1 | Subgroup: Gas trains

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward