3G Electric
metano | Subgroup: Gas trains
FBR

metano | Subgroup: Gas trains

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS CE D1" S | Variant: metano | Subgroup: Gas trains

Minimum order
4 units
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stageSingle stage
fuel typeGas
nozzle mm130
weight kg11
descriptionGas burners two stages.
fan motor w75
power kw max174
power kw min69.8
ip protectionIP 40
noisiness dba60-61
power kcal max150
power kcal min60
gas consumption1.8/2.3-5.8
electrical supply1
power supply info1N~230V
current absorption a0.55
thermal power mcal h15.5/20-50
nominal electric power w110
max combustion air temp c60

Frequently asked questions

Where can I source the FBR GAS CE D1" metano burner in Indonesia?+

3G Electric Indonesia supplies the FBR GAS CE D1" metano burner with delivery to Jakarta and Surabaya. We handle all Bea Cukai customs clearance and logistics coordination, providing IDR invoicing and technical support for gas train integration.

What is the lead time for the FBR GAS CE D1" metano burner?+

Lead time on request. 3G Electric sources this single-stage gas burner from Italy and coordinates full customs clearance to Indonesia. Contact us for specific delivery schedules to your facility in Jabodetabek or Surabaya.

What thermal power and noise level does the FBR GAS CE D1" deliver?+

The FBR GAS CE D1" metano burner delivers 15.5–50 mcal/h thermal power (69.8–174 kW) with a 75 W fan motor. Operating noise is 60–61 dB at IP 40 protection, suitable for modular gas train systems with precise combustion control.

Enquire about metano | Subgroup: Gas trains

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward