3G Electric
variant_2 | Subgroup: Gas trains (1)
FBR

variant_2 | Subgroup: Gas trains (1)

On RequestDual fuel: gas / diesel - Gas trains (1)

Price on request — send us an enquiry for current pricing.

GAS/M CE D2" FS50 | Variant: variant_2 | Subgroup: Gas trains (1)

Minimum order
3 units
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

nozzle mm328
power kw max805
power kw minDX90¡

Frequently asked questions

Where can I buy the FBR 056175 dual-fuel gas train in Indonesia?+

3G Electric Indonesia supplies the FBR 056175 gas train with delivery to Jakarta and Surabaya. We handle all logistics, Bea Cukai import documentation, and customs clearance. Contact us for lead time and IDR pricing.

What is the lead time and delivery schedule for this FBR gas train?+

Lead time depends on Italy stock and current import schedules. 3G Electric manages all logistics to Indonesia, typically 4–8 weeks door-to-door. Exact timing available on request with your purchase order.

What is the maximum power output and nozzle size of FBR 056175?+

The FBR 056175 delivers up to 805 kW maximum power output with a 328 mm nozzle diameter. It supports both gas and diesel fuel switching for flexible large-scale heating and power generation applications.

Enquire about variant_2 | Subgroup: Gas trains (1)

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Dual fuel: gas / diesel - Gas trains (1)

Browse all Dual fuel: gas / diesel - Gas trains (1)arrow_forward