Kami mengirim ke Indonesia — pintu ke pintu, bea cukai dan logistik ditangani oleh 3G Electric

FBR variant_2 - Burners & Combustion
FBRBurners & Combustion

FBR variant_2

FBR GAS P100/2 CE EVO adalah pembakar gas dua tahap (2 stages) yang dirancang untuk aplikasi industri dengan daya termal maksimal 1163 kW dan daya minimum 200 kW. Produk ini dilengkapi bodi aluminium, kipas udara…

SKU 3G-FBR-00404

Juga terdaftar sebagai: 00236741 · 002367 41 · 002367-41

Merek
FBR
Item
variant_2
Kategori
Burners & Combustion
UNSPSC
40101834 — Burners
Tersedia untuk Dipesan
Stok tersedia & bea cukai ditangani
  • 6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
  • Invoicing in IDR or USD. Bank transfer and corporate PO accepted.
  • Dikirim ke: Jakarta, Surabaya, Bandung, Medan, Batam
Harga dagang sesuai penawaran — balasan dalam 24 jam
Jumlah
WhatsApp seorang insinyurMessage via Telegram
Tidak perlu akun — permintaan penawaran Anda langsung masuk ke tim insinyur kami. Akun gratis memungkinkan Anda melacak penawaran dan memesan ulang lebih cepat.
Distributor Resmi
Langsung dari OEM
Pengiriman ke Seluruh Dunia
Pengiriman udara & laut
Lembar Data Atas Permintaan
Spesifikasi teknis
Penawaran 1 Hari
Balasan dalam 24 jam

Local availability & support — Indonesia

Phone
+65 8878 8355

Spesifikasi Teknis

FBR
Weight
44 kg
stage
2 stages
fuel type
Gas
nozzle mm
250
fan motor w
1.5
power kw max
1163
power kw min
200
ip protection
IP 40
noisiness dba
81-82
gas consumption
20.1/58.3-116.7
electrical supply
3
power supply info
3~400V, 1/N~230V-50Hz
current absorption a
3.6
thermal power mcal h
172/500-1000
nominal electric power w
1.7
max combustion air temp c
60

Konten Lembar Data

GAS BURNERS TWO STAGES 071098_A_gb GAS BURNERS TWO STAGES GAS P100/2 CE EVO Gas burners two stages with: aluminum body, air blower at high pressurisation at reverse blades and combustion head with adjustment at high efficiency and high flame stability. Compact overall dimensions and disposition rationalized of the components with accessibility facilitated for the easy setting and maintenance. Available in the versions METHANE (natural gas) or L.P.G. (to specify at the order) on demand specific versions for town gas, coal gas or biogas. Gas train completely assembled, electrically linked and tested; composed by: two stages working valve with flow adjustment, safety valve, minimum gas pressure switch and stabiliser filter of gas pressure. Complete of flange and gasket for installation on generator. Fig. 1 GAS P100/2 CE EVO GAS P100/2 CE EVO GAS BURNERS TWO STAGES 071098_A_gb TECHNICAL DATA AND OPERATING RANGE DIAGRAM GAS P100/2 CE EVO MODEL GAS P100/2 CE EVO Thermal power min. 1°st. / min. 2°st. - max. 2°st. * [Mcal/h] 172/500-1000 Thermal power min. 1°st. / min. 2°st. - max. 2°st. * [kW] 200/581-1163 Gas flow G20 (NATURAL GAS) min. 1°st. / min. 2°st. - max. 2°st. * [Nm³/h] 20.1/58.3-116.7 Gas flow G25 (NATURAL GAS) min. 1°st. / min. 2°st. - max. 2°st. * [Nm³/h] 23.3/67.8-135.7 Gas flow G25.3 (NATURAL GAS) min. 1°st. / min. 2°st. - max. 2°st. * [Nm³/h] 22.8/66.3-132.7 Gas flow G31 (L.P.G.) min. 1°st. / min. 2°st. - max. 2°st. * [Nm³/h] 7.8/22.5-45.1 Fuel: NATURAL GAS (second family, G20, G25, G25.3) - L.P.G. (third family, G31) Fuel category: I2R,I2H,I2L,I2E,I2E+,I2Er,I2ELL,I2E(R) I3B/P,I3+,I3P,I3B,I3R Intermitted working operation (min. 1 stop every 24 hours) two stages Environmental conditions operation / storage: -15...+40°C / -20...+70°C, rel. humidity max. 80% Max. temperature combustion air [°C] 60 Minimum pressure gas train D1"1/4-S NATURAL GAS/L.P.G. ** [mbar] 93/60 Minimum pressure gas train D1"1/2-S NATURAL GAS/L.P.G. ** [mbar] 42/38 Minimum pressure gas train D2"-S NATURAL GAS/L.P.G. ** [mbar] 32/35 Maximum pressure at the entry of valves (Pe. max) [mbar] 360 Nominal electric power [kW] 1.7 Fan motor [kW] 1.5 Nominal motor current absorption [A] 3.6 Nominal auxiliary absorption [A] 0.7 Power supply: 3~400V, 1/N~230V-50Hz Electric protection degree: IP 40 NOx Class, NATURAL GAS (second family) 1 NOx Class, L.P.G. (third family) 2 Noisiness *** min. - max. [dB(A)] 81-82 Burner weight **** [kg] 44 * Reference conditions: Environment temperature 20°C - Barometric pressure 1013 mbars - Altitude 0 metre (sea level). ** Minimal feeding-gas pressure to the gas train to get the maximum power of the burner, considering counter-pressure in combustion chamber of value 0 (zero). *** Measured sonorous pressure in the laboratory combustion, with functional burner on beta boiler to 1 metre of distance (UNI EN ISO 3746 law - Control method class 3 - The measured sound pressure tolerance can be assumed to be ± 1 [dB (A)]). **** For burner with long head add 2 kg to the weight. GAS P100/2 CE EVO GAS BURNERS TWO STAGES 071098_A_gb ΀ŵďĂƌ΁ 18 ' '^WϭϬϬͬϮsK DWK/>sKZK ϭϭϲϯ ϳ͘ϱ ϭϮϲϵ ϳ͘ϴ 16ϵϴϴ ϭϮ͘ϱ ϭϬϳϴ ϭϯ͘ϴ ϱϴϭ ϭϰ͘ϱ ϲϯϰ ϭϲ ϮϬϬ ϭ͘ϱ ϮϬϬ Ϭ ϭϭϲϯ ϳ͘ϱ 14ϯϴϯ Ϭ ϯϴϯ Ϭ͘ϰ ϱϴϭ Ϭ ϭϭϲϯ Ϭ ϵϴϴ ϭϮ͘ϱ ϭϭϲϯ ϳ͘ϱ ϯϮϱ ϭ͘Ϯ 12 10 8 6 4 2 0 Fig. 2 X400 = Thermal power 0 200 600Y = Pression in the combustion 800 chamber 1000 1200 1400 ;kW= The firing rates has been obtained based on test boilers in accordance with EN267 standards and are indicative of matching the burner to the boiler. For the correct operation of the burner, combustion chamber dimensions must be in accordance with current regulation. In case of non-compliance, contact the manufacturer. DIMENSIONS [MM] 290 140 280 O 185 266 25 510 240 294 181 B 380 TC - TL 764 A ' Fig. 3 Dimensions GAS TRAIN A B D1"1/4-S 437 382* D1"1/2-S 458 396 D2"-S 458 396 * Includes length of 66 mm due to adapter code 057020 TC - TL: Please see chapter "Flame tube length" GAS P100/2 CE EVO GAS BURNERS TWO STAGES 071098_A_gb BOILER PLATE The dimensions of the boiler plate must be as indicated in the drawing. * Suggested dimension of connection between burner and generator. MODEL L min L* L max M N min N max GAS P100/2 CE EVO mm 195 195 250 M12 275 325 FLAME TUBE LENGTH Flame tube length must be selected based on the specifications supplied by boiler manufacturer and, in any case, it must be greater than the thickness of the boiler door included its insulation. In case of boilers with flame inversion or front flue combustion chambers, it is necessary to insulate the area between the flame tube and front door with refractory material. This protection material must not impede flame tube extraction. FLAME TUBE LENGTH TC mm 252 TL mm 387 * * For different flame lengths, please contact our Technical-Sales Department. GAS P100/2 CE EVO GAS BURNERS TWO STAGES 071098_A_gb BURNER SIGNAL DESCRIPTION In the picture below there are indicated all the signalation present on the burner: 2 1 V V Fig. 4 Burner signal description LEGEND 1) ON/OFF button 2) Reset from lockout button + status lamp The multicolor signal lamp in the lockout reset button (pos.2) is the key indicating element for visual diagnostics and interface diagnostics. In normal operation, the different operating states are indicated in the form of color codes; please refer to electrical device handbook supplied with the present instructions. After a non-alterable lockout, the red signal lamp in the lockout reset button (pos.2) lights up. By pressing the lockout reset button (pos.2) for more than 3 seconds, the visual diagnostics of the cause of fault can be activated; please refer to electrical device handbook supplied with the present instructions. For close the diagnostics mode and for switch on the burner again, it is necessary to reset the burner control. Press the lockout reset button (pos.2) for about 1 second (<3 seconds). After a non-alterable lockout, the red signal lamp in the lockout reset button (pos.2) lights up. For reset the control box press the lockout reset button (pos.2) for about 1 second (<3 seconds). GAS P100/2 CE EVO GAS BURNERS TWO STAGES 071098_A_gb PRODUCT SPECIFICATION SHORT DESCRIPTION Gas burners two stages. DETAILED SPECIFICATION Gas burner two stages composed by: • Aluminum body; • Fan at high pressurisationwith reverse blades; • Combustion head with adjustment at high performance and elevated flame stability equipped with inox steel blast tube and inox steel flame disc; • Flange and insulating gasket for fixing at…

Dokumen Teknis

Tidak ada dokumen teknis yang tersedia untuk produk ini.
Minta dokumentasi
Tidak yakin ini adalah suku cadang yang tepat? Minta rekomendasi.

Butuh bantuan pemasangan atau rekayasa?

Instalasi, komisioning, rencana pemeliharaan, desain sistem, dan penawaran produk + layanan bundel — satu tim menangani cakupan penuh.
Bicaralah dengan seorang insinyur

Ajukan pertanyaan

FBR Produk
3G Electric (S) Pte. Ltd. — Singapore

Deskripsi Produk

FBR GAS P100/2 CE EVO adalah pembakar gas dua tahap (2 stages) yang dirancang untuk aplikasi industri dengan daya termal maksimal 1163 kW dan daya minimum 200 kW. Produk ini dilengkapi bodi aluminium, kipas udara bertekanan tinggi dengan sudu terbalik, serta kepala pembakaran yang dapat disetel untuk efisiensi tinggi dan stabilitas nyala api yang optimal. Dengan konsumsi gas G20 (natural gas) antara 20,1 hingga 116,7 Nm³/h, pembakar ini cocok untuk berbagai jenis gas seperti metana (natural gas) atau LPG, dan tersedia dalam versi khusus untuk gas kota, gas batu bara, atau biogas atas permintaan.

Supplied to Indonesia — compatible with 50 Hz installations. DHL Express delivery to Jakarta, Surabaya, Bandung, customs and duties handled door-to-door.

Pertanyaan yang Sering Diajukan

Apa spesifikasi teknis FBR GAS P100/2 CE EVO?

FBR GAS P100/2 CE EVO memiliki daya termal 200/581-1163 kW, konsumsi gas G20 20,1/58,3-116,7 Nm³/h, motor kipas 1,5 kW, proteksi IP 40, dan suplai listrik 3~400V atau 1/N~230V-50Hz. Berat produk 44 kg dengan diameter nosel 250 mm.

Untuk apa FBR GAS P100/2 CE EVO digunakan?

Pembakar gas dua tahap ini digunakan pada ketel uap industri, tungku, dan generator panas lainnya yang memerlukan pembakaran gas metana (natural gas) atau LPG. Produk ini cocok untuk aplikasi dengan daya termal hingga 1163 kW dan memerlukan pengoperasian intermiten (minimal 1 stop setiap 24 jam).

Apa saja komponen rangkaian gas pada FBR GAS P100/2 CE EVO?

Rangkaian gas sudah terpasang lengkap dan teruji, terdiri dari katup kerja dua tahap dengan penyesuaian aliran, katup pengaman, sakelar tekanan gas minimum, dan filter penstabil tekanan gas. Semua komponen terhubung secara elektrik dan siap pakai.

Di mana beli FBR GAS P100/2 CE EVO di Indonesia?

Anda dapat membeli FBR GAS P100/2 CE EVO melalui 3G Electric, distributor resmi yang memasok dan mengirimkan peralatan industri ini ke seluruh Indonesia. Kami menangani logistik dan bea cukai sehingga produk sampai ke lokasi Anda dengan aman. Hubungi kami untuk minta penawaran.

Bagaimana cara memilih versi gas yang tepat untuk FBR GAS P100/2 CE EVO?

Pilih versi metana (natural gas) untuk gas G20, G25, atau G25.3, atau versi LPG untuk gas G31. Saat memesan, sebutkan jenis gas yang digunakan. Produk ini juga tersedia versi khusus untuk gas kota, gas batu bara, atau biogas atas permintaan.

Digunakan dalam

Aplikasi umum untuk FBR
Hospitality and commercial HVAC — cast-iron boiler plants in hotels and shopping complexes
Pharmaceutical and biotech process heat — gas-fired burners with ATEX gas trains for classified-zone requirements
Medical-waste and bio-hazard incineration — FGP progressive dual-fuel systems
Food and beverage steam boilers — single-stage G-series for continuous-duty cycles
Marine and offshore platforms — IP54-rated X-series for high-humidity marine operations

FBR Produk

3G Electric memasok FBR burners & combustion. Kami menyediakan produk asli dengan ketersediaan tersedia di gudang untuk SKU umum, dokumentasi teknis, dukungan commissioning, dan layanan garansi — di seluruh dunia.

Anda mungkin juga membutuhkan

Rangkaian Gas & Katup Gas Transformator Pengapian Kontrol Pembakar Suku Cadang Semua Produk

Compatible alternatives & equivalents

Cross-referenced by specification & description
GAS P 100/2 CE TC EVO | Variant: variant_1 | Subgroup: Burner
FBR
GAS P 100/2 CE TC EVO | Variant: variant_1 | Subgroup: Burner
GAS P 100/2 CE TL EVO | Variant: variant_2 | Subgroup: Burner
FBR
GAS P 100/2 CE TL EVO | Variant: variant_2 | Subgroup: Burner
GAS P 100/M CE TC EVO | Variant: variant_2 | Subgroup: Burner
FBR
GAS P 100/M CE TC EVO | Variant: variant_2 | Subgroup: Burner
GAS P 100/2 CE TL EVO | Variant: variant_1 | Subgroup: Burner
FBR
GAS P 100/2 CE TL EVO | Variant: variant_1 | Subgroup: Burner
GAS P 100/M CE TC EVO | Variant: variant_1 | Subgroup: Burner
FBR
GAS P 100/M CE TC EVO | Variant: variant_1 | Subgroup: Burner
GAS P 100/M CE TL EVO | Variant: variant_2 | Subgroup: Burner
FBR
GAS P 100/M CE TL EVO | Variant: variant_2 | Subgroup: Burner

Lainnya dari FBR

Lihat semua FBR suku cadang
FBR
FBR
GAS X1 CE TL
FBR
FBR
GAS P 130/M CE-LX4 EL EVO TL
GAS P 550/M CE-LX TL EL EVO
FBR
GAS P 550/M CE-LX TL EL EVO
FBR
FBR
GAS X 0 CE THLS
GAS XP 40/M CE TC
FBR
GAS XP 40/M CE TC
FBR
FBR
GAS P 190/M CE-LX TL MEC
FBR
FBR
GAS P 450/M CE-LX TL EL EVO
FBR
FBR
GAS X 3/2 CE-LX TL