3G Electric
variant_2 | Subgroup: Burner
FBR

variant_2 | Subgroup: Burner

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS P 130/2 CE EVO TC | Variant: variant_2 | Subgroup: Burner

Minimum order
1 unit
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages
fuel typeGas
nozzle mm280
weight kg43
descriptionGas burners two stages.
fan motor w2.2
power kw max1540
power kw min240
ip protectionIP 40
noisiness dba82-83
gas consumption24/71.5-155
electrical supply3
power supply info3~400V, 1/N~230V-50Hz
current absorption a4.35
thermal power mcal h206/612-1324
nominal electric power w2.4
max combustion air temp c60

Frequently asked questions

Where can I source the FBR GAS P 130/2 CE EVO TC burner in Indonesia?+

3G Electric Indonesia supplies the FBR GAS P 130/2 CE EVO TC. We handle delivery to Jakarta and Surabaya, manage Bea Cukai import customs, and provide IDR invoicing. Contact us for lead time and quotation on this 240–1540 kW two-stage gas burner.

What is the lead time for the FBR GAS P 130/2 gas burner to Indonesia?+

Lead time depends on current availability and import customs processing. 3G Electric sources this burner to order with delivery to Jakarta and Surabaya. Contact us for a specific lead-time quote and logistics schedule for the FBR GAS P 130/2 CE EVO TC.

What electrical supply does the FBR GAS P 130/2 CE EVO TC require?+

The FBR GAS P 130/2 CE EVO TC operates on 3~400V, 1/N~230V, 50 Hz with a fan motor rated 2.2 kW and current absorption of 4.35 A. It delivers 240–1540 kW thermal power across two stages for mid-to-large industrial heating systems.

Enquire about variant_2 | Subgroup: Burner

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward