3G Electric
variant_2 | Subgroup: Burner
FBR

variant_2 | Subgroup: Burner

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS P 160/2 CE TL | Variant: variant_2 | Subgroup: Burner

Minimum order
1 unit
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages
fuel typeGas
nozzle mm280
weight kg44
descriptionGas burners two stages.
fan motor w4
power kw max1915
power kw min300
ip protectionIP 40
noisiness dba84.3-86.6
gas consumption30.2/89.5-192
electrical supply3
power supply info3~400V, 1/N~230V-50Hz
current absorption a7.45
thermal power mcal h258/765-1647
nominal electric power w4.2
max combustion air temp c60

Frequently asked questions

Where can I buy the FBR GAS P 160/2 CE TL gas burner in Indonesia?+

3G Electric Indonesia supplies the FBR GAS P 160/2 CE TL for delivery to Jakarta and Surabaya. We handle import logistics, Bea Cukai customs clearance, and IDR invoicing. Lead time on request—contact us for a quote.

What is the shipping timeline for the FBR GAS P 160/2 CE TL to Indonesia?+

Lead time depends on current stock and logistics routing. 3G Electric coordinates all import documentation and clearance to Indonesia. Request a shipping timeline when you place your order inquiry.

What is the maximum thermal power output of the FBR GAS P 160/2 CE TL?+

The FBR GAS P 160/2 CE TL delivers a maximum thermal power of 1647 mcal/h and 1915 kW gross power output. It operates at 3~400V, 50 Hz with two-stage modulation for industrial heating applications.

Enquire about variant_2 | Subgroup: Burner

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward