variant_2 | Subgroup: Burner with mechanical cam
Price on request — send us an enquiry for current pricing.
GAS P 300/M CE TL MEC | Variant: variant_2 | Subgroup: Burner with mechanical cam
Technical specifications
Frequently asked questions
Where can I source the FBR GAS P 300/M CE TL MEC burner in Indonesia?+
3G Electric Indonesia supplies the FBR GAS P 300/M CE TL MEC. We deliver to Jakarta and Surabaya with full customs and Bea Cukai handling. Request a quotation for lead time and IDR pricing through www.3g-electric.id.
What is the lead time for this FBR gas burner?+
Lead time varies based on stock availability and origin logistics. Contact 3G Electric for a confirmed delivery schedule. We manage all import documentation and customs clearance to Indonesia.
What thermal power range does the FBR GAS P 300/M CE TL MEC deliver?+
The burner delivers 465–3488 kW thermal power with two-stage sliding or modulating flame control at 500 mbar gas pressure. The 22 W fan motor and IP54/IP40 protection suit medium to large industrial heating applications.
Enquire about variant_2 | Subgroup: Burner with mechanical cam
Tell us your required quantity and delivery location — we reply within one business day.










