KIPP Male-End Leveling Mount: Swiveling Stud, M16 Thread Size, 60 mm
The KIPP Male-End Leveling Mount: Swiveling Stud (MPN K1303.206016X190) is a hygienic male leveling mount with a polished finish, round base, and M16 thread size (60 mm). It supports a load capacity of 10 kN and…
SKU 3G-OTH-522236
- 6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
- Invoicing in IDR or USD. Bank transfer and corporate PO accepted.
- Dikirim ke: Jakarta, Surabaya, Bandung, Medan, Batam
Butuh bantuan pemasangan atau rekayasa?
Ajukan pertanyaan
Deskripsi Produk
The KIPP Male-End Leveling Mount: Swiveling Stud (MPN K1303.206016X190) is a hygienic male leveling mount with a polished finish, round base, and M16 thread size (60 mm). It supports a load capacity of 10 kN and includes mounting holes for installation.
Supplied to Indonesia — compatible with 50 Hz installations. DHL Express delivery to Jakarta, Surabaya, Bandung, customs and duties handled door-to-door.
Pertanyaan yang Sering Diajukan
What is a KIPP male-end leveling mount used for?
A KIPP male-end leveling mount is used to level and stabilize industrial machinery, equipment, and workstations. Its swiveling stud and polished finish suit hygienic environments like food processing or pharmaceutical plants. 3G Electric supplies this mount across 14 industrial departments, including material handling and pneumatics.
What are the specifications of the KIPP K1303.206016X190 leveling mount?
The KIPP K1303.206016X190 leveling mount has an M16 thread size, 60 mm stud length, polished finish, round base, and a load capacity of 10 kN. Mounting holes are included for secure installation. 3G Electric sources this genuine KIPP part for worldwide delivery.
Where to buy KIPP leveling mounts worldwide?
3G Electric supplies KIPP leveling mounts worldwide, handling full logistics and customs clearance. As a global industrial solutions provider, we interpret your demand and deliver genuine KIPP parts like the K1303.206016X190. Contact us for availability and lead time to your location.
How to install a KIPP swiveling stud leveling mount?
To install a KIPP swiveling stud leveling mount, thread the M16 stud into a matching tapped hole in the equipment base. Use the included mounting holes for additional bolting if required. Ensure the load does not exceed the 10 kN capacity. 3G Electric provides technical support for selection and installation.
Digunakan dalam
Aplikasi umum untuk KIPPKIPP Produk
3G Electric memasok KIPP hygienic male leveling mounts. Kami menyediakan produk asli dengan ketersediaan tersedia di gudang untuk SKU umum, dokumentasi teknis, dukungan commissioning, dan layanan garansi — di seluruh dunia.









