3G Electric
PUMP E2E2113 L FL.PETR.ENGINE VALVE R
Interpump

PUMP E2E2113 L FL.PETR.ENGINE VALVE R

On RequestIndustrial Pumps

Price on request — send us an enquiry for current pricing.

PUMP E2E2113 L FL.PETR.ENGINE VALVE R

Minimum order
4 units
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

power hp7.1
power kw5.22
weight kg7
flow l min13
flow us gpm3.43
pressure bar210
pressure mpa21
pressure psi3045
rotation regime rpm3400
overall dimensions l x l x h mm241.5

Frequently asked questions

Where can I source the Interpump E2E2113 pump in Indonesia?+

3G Electric Indonesia supplies the Interpump E2E2113 for delivery to Jakarta and Surabaya. We handle all Bea Cukai import documentation, customs clearance, and logistics. Contact us for lead times and IDR pricing.

What is the lead time for the Interpump E2E2113?+

Lead time varies by stock availability. The E2E2113 is available to order through 3G Electric. Contact our team for delivery estimates to your location in Indonesia.

What applications suit the Interpump E2E2113?+

The E2E2113 delivers 13 L/min at 210 bar (21 MPa) and 5.22 kW, rated for mobile and stationary petrochemical fuel injection systems requiring compact, engine-driven pressure generation at 3400 rpm.

Enquire about PUMP E2E2113 L FL.PETR.ENGINE VALVE R

Tell us your required quantity and delivery location — we reply within one business day.

More Interpump products

All Interpump productsarrow_forward

Related Industrial Pumps

Browse all Industrial Pumpsarrow_forward