3G Electric
variant_2 | Subgroup: Burner
FBR

variant_2 | Subgroup: Burner

On RequestGas burners

Price on request — send us an enquiry for current pricing.

X GAS X2/2 CE TC | Variant: variant_2 | Subgroup: Burner

Minimum order
1 unit
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages
fuel typeGas
nozzle mm90
weight kg11.5
descriptionGas burners two stages.
fan motor w75
power kw max93
power kw min24.4
ip protectionIP 40
noisiness dba61-62
gas consumption2.5/4.1-9.4
electrical supply1
power supply info50Hz
current absorption a0.55
thermal power mcal h21/35-80
nominal electric power w130
max combustion air temp c60

Frequently asked questions

Where can I order the FBR X GAS X2/2 CE TC gas burner in Indonesia?+

3G Electric Indonesia supplies the FBR X GAS X2/2 CE TC for delivery to Jakarta and Surabaya. We handle all logistics and customs clearance. Contact us for availability and lead times.

What is the lead time and shipping process for this gas burner?+

Lead time depends on current stock and import status. 3G Electric Indonesia manages Bea Cukai documentation and arranges delivery to your facility. Request a quote for a specific timeline.

What thermal power output does the FBR X GAS X2/2 CE TC deliver?+

The FBR X GAS X2/2 CE TC operates in two stages: 24.4 kW (low) to 93 kW (high). The 90 mm nozzle and 75 W fan motor suit compact boiler and furnace installations requiring modulating control.

Enquire about variant_2 | Subgroup: Burner

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward