3G Electric
variant_2 | Subgroup: Burner
FBR

variant_2 | Subgroup: Burner

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS P 100/2 CE TL EVO | Variant: variant_2 | Subgroup: Burner

Minimum order
1 unit
Lead time
6–10 business days door-to-door; Bea Cukai clearance typically 3–5 business days.
mailQuick enquiry

Technical specifications

stage2 stages
fuel typeGas
nozzle mm250
weight kg44
descriptionGas burners two stages.
fan motor w1.5
power kw max1163
power kw min200
ip protectionIP 40
noisiness dba81-82
gas consumption20.1/58.3-116.7
electrical supply3
power supply info3~400V, 1/N~230V-50Hz
current absorption a3.6
thermal power mcal h172/500-1000
nominal electric power w1.7
max combustion air temp c60

Frequently asked questions

Where can I order the FBR GAS P 100/2 CE TL EVO gas burner in Indonesia?+

3G Electric Indonesia supplies the FBR GAS P 100/2 CE TL EVO for delivery to Jakarta and Surabaya. We handle all logistics, customs clearance with Bea Cukai, and IDR invoicing. Contact us for availability and lead-time confirmation.

What is the thermal power output and fuel consumption of this FBR burner?+

The FBR GAS P 100/2 CE TL EVO delivers 172–1,000 mcal/h thermal power across two stages. Gas consumption ranges from 20.1 to 116.7 m³/h depending on modulation. The 250 mm nozzle ensures efficient combustion for medium to large industrial heating systems.

What electrical supply does the FBR GAS P 100/2 CE TL EVO require?+

The burner operates on 3~400V, 1/N~230V at 50 Hz with 3.6 A current absorption. The fan motor draws 1.5 W. IP 40 protection rating suits indoor industrial installations with standard noise output of 81–82 dBA.

Enquire about variant_2 | Subgroup: Burner

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward